30
Nov

Location: Shaw, Oldham, Lancs

Date: Nov 2010

Description: This bathroom renovation was part of a larger refurb…we practically rebuilt the entire house! Our client had purchased the property and had always planned on having all the work completed before she moved in. Although we’re only showing the bathroom here we also installed a new boiler, radiators and relocated the boiler from the kitchen to the upstairs airing cupboard, we completely gutted the kitchen and installed a new kitchen including all electrical work, we cleaned up the rest of the properties electrics and fit a new updated consumer unit, many walls and ceiling were repaired and re-plastered, the outside gutters and facia were repalced and the entire house was decorated and carpeted when complete.

The original bathroom showed signs of previous flooding. The structural particle board flooring was swollen and damaged in many sections and had to be replaced right through to one of the bedrooms! The tiling was past it’s best and the modern design our client wanted could not be achieved without some behind the scenes work. As we were gutting the kitchen too we decided to move all exposed plumbing behind the walls instead of boxing it back in like it was. The result was a nice clean finish that looks like something from a showroom.

Plan ahead, plan ahead, plan ahead and you can achive the same clean results.





Related Posts

  1. Complete Bathroom Refurbishment
  2. Bathroom Swap (Bathroom and Bedroom)
  3. Bathroom Replacement with Whirlpool Bath
  4. Bathroom Refurbishment PLUS
  5. Separate Bathroom and Toilet To Wetroom
Category : Advertising